PROGRESS REPORT

August 18, 2017

This purpose of this post is to publish single line
status reports on the projects performed during the week.

**************************************************************
**************************************************************

2017-08-13

RELATIVITY BOOK

The second section of the book is being tested and corrected
by preparing it for a reading at a Toastmasters meeting.

APPLE PORTABILITY PROJECT

A second attempt at preparing a working MAK for my protability
tool will be made. The nano editor, designed for use in the
terminal, will be used as the interface between the make file
generated in a Linux machine and one suitably formatted for
the IMACs machine.

Advertisements

PROGRESS REPORT

July 21, 2017

This purpose of this post is to publish single line
status
reports on the projects performed during the week.

**************************************************************
**************************************************************

2017/07/14

IMACS PORTABILITY PROGRAMMING

At this moment, the current gcc program has successfully
compiled the source files of the explrpde software
development tool but has not linked the object files.
Today, I found a website which helped me verify that
the correct version of gcc has been installed successfully
on my IMACS computer.

**************************************************************

2017/07/15

RELATIVITY BOOK / TOASTMASTERS

The Introduction and title have been revised in response
to the suggestions made by my Toastmaster’s mentor. It
is my plan to read the book at a number of Toastmaster
meetings.

**************************************************************

2017/07/20

RELATIVITY BOOK / TOASTMASTERS

The Final preparations of first Relativity book reading at the
Toastmaster’s meeting this Saturday have been made.

PROGRESS REPORT

June 2, 2017

This purpose of this post is to publish single line status
reports on the projects performed during the week.

**************************************************************
**************************************************************

2017/05/29

APPLE PROJECT

The Apple Version of the Microsoft Visual Studio was successfully
installed but unfortunately was found unusable for the current
needs. It supported C# but not C++ which I need for the near-
term installation.

RELATIVITY BOOK

I am still making important modifications to the book to
strengthen it. My Toastmaster Mentor has provided me with some
valuable suggestions.

PROGRESS REPORT

May 12, 2017

This purpose of this post is to publish single line status
reports on the projects performed during the week.

**************************************************************
**************************************************************

2017/05/06

RELATIVITY BOOK

The “Moment Of Discovery” Section has been successfully prepared
**************************************************************

2017/05/09

RELATIVITY BOOK

A comment was made that the “Rules Of Physics” was a bit
difficult to read due its technology. This comment will
be seriously considered during the update of this section
which is the next task.

APPLE PROJECT

The make file statement order was changed (Link statement is now written first and the compile statements second) and tested. No change in the error statement occurred. Either
the specific statement has an unknown problem or the order of the compile statements also needs to be changed.
**************************************************************

2017/05/10

RELATIVITY BOOK

The “THE DISCOVERY” Section has been started and
a preliminary version of the Summary Statements
has been prepared.

PROGRESS REPORT

April 28, 2017

This purpose of this post is to publish single line status
reports on the projects performed during the week.

**************************************************************
**************************************************************

2017/04/21

APPLE PROJECT

The necessary files (source, make files) have been transferred
to the IMACS machine. The testing of the make file in the
Apple machine will begin.

**************************************************************

2017/04/22

APPLE PROJECT

Ran the make file on the IMACS for the first time. Base directory
was incorrect. Modifications to the source code will be made and
a new make file will be generated.

**************************************************************

2017/04/23

RELATIVITY BOOK

The page describing my efforts to test the accuracy of my computer
simulation effort reported in Oslo, Norway has been completed.
The revised page has been added to the Open Source version of the
book. The format of this page will be reviewed.

**************************************************************

2017/04/24

APPLE PROJECT

Base directory
was corrected. Make and object file were found.
There are still problems in processing the header file. An attempt
to find documents that will define the gcc / apple application.

**************************************************************

2017/04/26

RELATIVITY BOOK

The page presenting my Prague Conference experience has been
tentatively prepared. Minor revisions are expected. The
story-telling strength needs to be improved.

PROGRESS REPORT

April 20, 2017

This purpose of this post is to publish single line status
reports on the projects performed during the week.

**************************************************************
**************************************************************

2017/04/14

APPLE PROJECT

The maccert make file error was corrected. Additional similar make file
errors were found. A detailed source file examination is needed.

**************************************************************

2017/04/15

APPLE PROJECT

A detailed source file examination has been performed; there are no
detected errors in the source section of the test make-generation
files.

RELATIVITY BOOK

The Addition of Mathematical section into the Open Source version
of the book continues. The Computer simulation page has been
replaced with a Numerical Approximation Section. Spelling Errors
have been detected but not as yet corrected.

**************************************************************

2017/04/16

APPLE PROJECT

The functional testing of the Apple-based Mac development tool
has been completed. The explrpde folder will be copied to the Apple
machine and an attempt to compile the explrpde tool will be made.

**************************************************************

2017/04/17

RELATIVITY BOOK

The modifications of the page describing my efforts to test the
accuracy of my computer simulation effort reported in Oslo,
Norway has been made. This page has been added to the Open
Source version of the book. The detected spelling error has
been corrected.

**************************************************************

2017/04/19

CLASS DEVELOPMENT PROJECT

The ASCII and UNICODE software parts have been successfully added
and functionally tested in the common typedef software parts
library.

PROGRESS REPORT

April 14, 2017

eports on the projects performed during the week.

**************************************************************
**************************************************************

2017/04/09

RELATIVITY BOOK

The Addition of Mathematical section into the Open Source version
of the book has been started. The Formula/equation and differential
equation page has been added without modification.

**************************************************************

2017/04/10

RELATIVITY BOOK

The Addition of Mathematical section into the Open Source version
of the book continues. The Differential
equation page has been
slightly modified.
The Computer page has been added without
modification.

APPLE PROJECT

The Header Subsection (_MAKE_FILE_HEADER_BEGIN,
_MAKE_FILE_HEADER_LOAD, and _MAKE_FILE_HEADER_END)
has been functionally tested and the testing of the Source
Subsection has been started.

**************************************************************

2017/04/13

APPLE PROJECT

The Source Subsection is proceeding. The Commands
_MAKE_FILE_SOURCE_BEGIN, _MAKE_FILE_SOURCE_NEXT,
_MAKE_FILE_CALL_HEADER, _MAKE_FILE_SOURCE_CALLED,
and _MAKE_FILE_SOURCE_CALL_END have been functionally
tested. An error was identified in original make file.
Namely, the module maccert was included the link for
the explrpde executable but not listed as being called.

PROGRESS REPORT

April 7, 2017

This purpose of this post is to publish single line status
reports on the projects performed during the week.

**************************************************************
**************************************************************

2017/03/30

RELATIVITY BOOK

The Open Office prototype version of the Title page,
Introduction section, and Early History sections has been
reviewed on the IMACS machine. The only possible problem was
that the pages appeared to be too large. You can not
see the top of the page at the same time that as the page
number at the bottom.

**************************************************************

2017/03/31

APPLE PROJECT

The workspace files needed to run the functional test have
been prepared and the functional testing has been started.

**************************************************************

2017/04/02

RELATIVITY BOOK

The My First Personal Computer section has been inserted
into the Open Office prototype document. Minor revisions
to this section are expected. This section will be reviewed.

**************************************************************

2017/04/02

APPLE PROJECT

The _MAKE_FILE_BEGIN Command which loads make file name and
path being produced has been successfully tested.

**************************************************************

2017/04/05

APPLE PROJECT

The _MAKE_FILE_COMPILER, _MAKE_FILE_LINKER, _MAKE_FILE_WORKPATH, _MAKE_FILE_EXEC_SUBPATH, _MAKE_FILE_OBJ_SUBPATH, and
_MAKE_FILE_SRC_SUBPATH have been successfully tested.

RELATIVITY BOOK

The My First Conference – Oslo page has been inserted
into the Open Office prototype document.

PROGRESS REPORT

March 31, 2017

This purpose of this post is to publish single line status
reports on the projects performed during the week.

**************************************************************
**************************************************************

2017/03/24

RELATIVITY BOOK

The second Beginning Lockheed section has been preliminarily
modified. The next task will be to review these modifications

APPLE PROJECT

The preparation of the test program is completed. The next
task will be to prepare the apple_cpp software parts library.

**************************************************************

2017/03/28

RELATIVITY BOOK

The Early History section including the Lockheed chapters has
been completed in an ASCII text format. The next task will be
to prepare a tentative Open Office version to verify format.

CLASS DEVELOPMENT PROJECT

Modification of the Typedef software parts library to include
the specification of both an ASCII and UNICODE Characters is
planned.

**************************************************************

2017/03/29

RELATIVITY BOOK

The Open Office prototype version of the Title page,
Introduction section, and Early History sections has been
prepared. The next task will be to review this presentation
relative to developing an E-Book.

APPLE PROJECT

The preparation of the apple_cpp software parts library
has been prepared. The next task will be to prepare the
workspace files needed to run the functional test.

PROGRESS REPORT

March 23, 2017

This purpose of this post is to publish single line status
reports on the projects performed during the week.

**************************************************************
**************************************************************

2017/03/18

RELATIVITY BOOK

A tentative Early History section has been prepared. The goal
of this section is to encourage the hobby by showing the
unexpected benefits that can happen. Personal research will
be introduced later. This section will be reviewed and modified
as necessary.

**************************************************************

2017/03/20

RELATIVITY BOOK

A tentative Early History section has been reviewed and
found activity support the overall goal of the book. The
next task will be to address the first of the two Beginning
Lockheed sections.

APPLE PROJECT

During the process of assembling the source section of the test
project, it was found that there is an unavoidable need for
optional header file specification instructions for each
subroutine. I knew that it was possible but hoped that
it was avoidable. It is not. The next task will be to prepare
this software part instruction.

**************************************************************

2017/03/22

RELATIVITY BOOK

The first of the Beginning Lockheed sections has been modified.
The next task to address the second Beginning Lockheed sections.

APPLE PROJECT

The Optional Header instruction has been prepared and is
being inserted into the test program. The preparation of
the test program continues.